Return to the Zeus Virtual Energy Library Dashboard
Market Statistics and Analysis of Gas Monetization and Gasifivcation Projects Worldwide
Search
Upstream Gas Data -Tanzania
Last Updated Mar. 27 2008
Region :Sub-Saharan Africa
 
Basin Tanzania Coastal
Field Mnazi Bay Gas Field
Location Mnazi Bay
Status Producing
Owners
Company Share
Artumas Group 80%
FMO 15%
Tanzania Petroleum Development Corporation 5%
Operators Artumas Group
Predominant Type Of Gas Associated gas & condensate
Reserves P90 (TCF) 0.19
Reserves P50 (TCF) 0.53
Reserves Mean (TCF) 0.7
Reserves P20/P10 (TCF) 1.39
Current Production (MMcfd) 50
Discovery Date 2005
Startup Date 11/29/2006
Producing Horizon K2 Sandstone
Formation Depth (ft) 4,790
Net Pay (ft) 63
Gas Test Flowrate (MMcfd) 10.9
Take Off Pipeline Mnazi Bay Mtwara
Pipeline Status Planned
Pipeline Capacity (MMcfd) 80
Gas Processing Plant Msimbati Peninsula Gas Processing Facility
Gas Processing Plant Status Operational
Gas Processing Plant Capacity (MMcfd) 25
Gas Utilization Three projects are proposed to commercialize Mnazi Bays gas including 1)Local/Regional Gas to power project, producing 35 mmcfd until 2023 2)Large power plant interconnected to national grid, with a 300MW gas load steady at 62.5Mmcfd 3)Marine Compressed Natural Gas( CNG) project beginning at 35 mmcfd in 2010 then expanding to 50 mmcfd in 2013
 
Note: Division of Region by USGS
Data source BP

Zeus Development Corporation
2424 Wilcrest, Suite 100
Houston, Texas 77042, USA
Main: 713-952-9500
Fax: 713-952-9526
Toll free in the U.S.: 1-888-478-3282