| Latest
News: |
|
| Status: |
Operational |
|
| |
 |
| Location (terminuses): |
Twynholm in Scotland to Ballylumford in Northern Ireland |
| Total Length (km): |
135 |
| Undersea Length (km) : |
|
| FID Date: |
|
| Construction Startup: |
1994 |
| First Gas: |
September 1996 |
| Ownership: |
| Company |
Share % |
| Premier Transmission Limited (PTL) |
100% |
|
| Operator: |
| Company |
Share % |
| Premier Transmission Limited (PTL) |
100% |
|
| Gas Source: |
Twynholm, Scotland |
| Diameter (inches): |
24 |
| Project Cost (Billion U.S.$): |
139 million |
| Permanent Employees: |
|
| Maximum Depth (meters): |
|
| Transport Contract Terms: |
|
| Capacity (bcfd): |
|
| Capacity (bmy): |
|
| Pressure (bars): |
|
| Pressure (PSI): |
|
| Major contractor: |
|
| Major equipment providers: |
|
| Number of construction employees: |
|
| Alternate Names: |
SNIP |
| Major website: |
|
Notes: |
|