Pipeline Name: Medgaz > Overview

 
LAST UPDATED: Jan. 24 2008
 
Latest News:

With a cargo of 6,000 high strength carbon steel pipes, the third and final delivery arrived at the Port of Almeria in early February of 2008.  The new pipe, each measuring 12 meters long and 24 inches in diameter, will enable completion of the MEDGAZ pipeline and allow gas to start flowing midyear 2009.  With an initial capacity of 8 billion cubic meters a year, Medgaz will transport natural gas from Beni Saf on the Algerian coast across the Mediterranean seabed to a receiving terminal located at El Perdigal Beach in Almeria.

Status: Under Construction
 
Click to Enlarge
Location (Terminuses): Beni Saf, Algeria to Perdigal Beach, Almeria, Spain
Total Length (km): 1,040
Length of Subsea Segment (km) : 210
FID Date (Initial Construction): December 2006
Initial Construction Startup: December 2007
Commercial Operation / First Gas: June 2009
Owners:
Company
Share
SONATRACH
20%
CEPSA
20%
BP
12%
ENDESA
12%
GAZ DE FRANCE
12%
IBERDROLA
12%
TOTAL
12%
Operator:
Company
Share
MEDGAZ S.A.
100%
Source of Gas: Hassi R'Mel and other gas fields
Diameter (Inches): 24
Project Cost (US$ Billions): 1.32
Maximum Subsea Depth (meters): 2,160
Capacity (Bcfd): 0.77
Capacity (Bcmy): 8
Pressure (bars): 200
Pressure (PSI): 3,000
Major contractor: Saipem S.p.A
Major Equipment Suppliers: Linepipe supply and coating: Mitsui, Sumitomo;
Turbo-compressors supply: Rolls Royce;
Compressor Station and Receiving Terminal engineering, construction, and commissioning: Técnicas Reunidas-Amec Spie Consortium
Number of Construction Employees: ~ 2,000
Major Website: www.medgaz.com
 
 
 
 
 
 
 