| State/province/country: |
US, AL |
| Facility name: |
Alabama Gas Corporation, Coosada, AL, Plant |
| Location details: |
Coosada, Alabama |
| Status Category (oper/prop/constr) |
Operational |
| Year of operation: |
1972 |
| Design/Engineer Contractor: |
CBI Industries |
| Major component suppliers |
Ingersoll-Rand, Altec Int., T-Thermal, J.C. Carter,
Caterpillar |
| Operator of plant |
Alabama Gas Corporation |
| Major owners |
Alabama Gas Corporation |
| Planned expansion (3 yrs) |
None |
| Other expansion developments: |
None |
| Liquefier plant contractor: |
CBI Industries |
| Liquefier process/cryogens: |
Mixed refrigerant cascade (MRC) |
| Liquefaction capacity: |
32,700 gallons/day (2.4 MMcf/day) |
| Storage tank contractor: |
CBI Industries |
| No/capacity storage tanks |
1 x 7.7 million gallons |
| Type/material of tanks: |
FES, double-wall carbon steel, aluminum, Perlite |
| Vaporization design cap# |
80 MMcf/day |
| No. vaporization trains: |
3 |
| Vaporizer type |
Submerged |
| Baseload/Peak hourly sendout: |
3.33 MMcf/hr (peak) |
| Sendout pressure capab# |
600 psig |
| Descript boiloff gas mamagement: |
Three-stage RDS Ingersol-Rand 350 HP elect. drive 550
psig max. sendout pressure; auto load 0-50-100% |
| LNG for outside sales |
32,700 gallons/day |
| Sales interruptible? |
Yes |
| LNG composition |
Methane 95+% |
| Trailer loading capacity |
Yes |
| Trailer unloading capac# |
Yes |
| Metering equipment/scales |
None |
| Spec#trailer requirements |
None |
| No. trailers owned/operate: |
2 |
| If none--carrier used |
Trussville LNG as needed |