Return to the Virtual Energy Library Dashboard
Market Statistics and Analysis of Gas Monetization and Gasifivcation Projects Worldwide
Search


 
 

Terminal Name: Alagasco, Double Springs, AL, Satellite Storage Plant > Project Overview

 
Last Updated: July 10, 2007
State/Province/Country: US, AL
Facility name:: Alagasco, Double Springs, AL, Satellite Storage Plant
Location details: 60 miles NW of Birmingham, Winston County, Alabama
Status Category (oper/prop/constr): Operational
Year of operation: 1994
Source of LNG: Alagasco Pinson LNG facility 85 miles away
Source Terminal:  
Function (seasonal, peak): Peakshaving
Design/Engineer Contractor: Alabama Gas Corporation
Engineering contractor: Litzinger & Co., Engineers
Construction contractor: EMCO
Major component suppliers: CS&P, Cryoquip, Corken, MVE, Thermax, Genbrac, Ajax
Operator of plant: Alabama Gas Corporation
Major owner(s): Alabama Gas Corporation
Planned expansion (3yrs): None
Other expansion developments: None
Storage tank contractor: MVE
Capacity (cubic meters): 1 x 15,000 gallons
Type/material of tanks: ASME
Total vaporization capac#: 0.4 MMcf/day
No. vaporization trains: 2
Vaporizer type: Ambient with trim heater
Baseload/Peak hourly sendout:: 16 Mcf/hr (peak)
Sendout pressure capab#: 150 psig
Description boiloff gas management: 1 Corken compressor, 150 psig max. sendout
LNG for outside sales: None
Sales interruptible?: Not applicable
LNG composition: Methane 95+%
Trailer unloading capac#: Yes
Trailer loading capacity: Yes
Metering equipment/scales: None
Spec#trailer requirements: None
No. trailers owned/operate: 2
If none--carrier used: Trussville LNG when needed
 
 
 
 
 
 

© Zeus Development Corp.